Incident response plan for Weblate¶
Àmbit i objectius¶
Aquest IRP cobreix els incidents que afecten la confidencialitat, la integritat o la disponibilitat dels desplegaments operats per Weblate.
Nota
Aquest pla està dissenyat específicament per a desplegaments operats per Weblate s.r.o. Altres desplegaments han d’adaptar els passos organitzatius i específics del proveïdor al seu propi entorn.
Handling an incident¶
One team member handles the incident and names an available teammate as a backup. They coordinate investigation, containment, recovery, reporting, and user communication, asking other teammates or outside specialists for help when needed. The backup takes over when the handler is unavailable.
Use Incident reporting for reporting decisions, deadlines, and a private incident note. No separate management approval is needed to begin responding.
Communication logistics¶
- Internal Communication:
El canal principal és Señal per a la coordinació entre persones.
Les alertes tècniques romanen fora de Signal per evitar sorolls.
- External Communication:
El correu electrònic s’utilitza per arribar als clients.
Les llistes de contactes dels clients es mantenen en diverses ubicacions per garantir l’accés durant les interrupcions del servei.
- Public Disclosure:
If an incident includes a Weblate product vulnerability, follow the product vulnerability reporting process and Política de divulgació de vulnerabilitats in Vulnerabilitat i gestió d’incidències.
Incident categories and severity¶
Incident activation¶
Declarar un incident quan es confirmi o se sospita fortament que un esdeveniment afecta la confidencialitat, la integritat o la disponibilitat del servei més enllà del soroll operatiu habitual.
Whoever identifies the incident alerts teammates through Signal. An available teammate takes responsibility, records the initial severity, and names a backup.
Reclassificar l’incident si l’abast o l’impacte canvia durant la investigació.
Incident categories¶
Categoria 1: Accés no autoritzat
Categoria 2: violació de la integritat de les dades
Categoria 3: interrupció o degradació del servei
Categoria 4: error de configuració incorrecta o de desplegament
Nivells de gravetat i SLA¶
These are operational response targets, not a statement of continuous staffing. Assess product-security reporting separately using Incident reporting; these targets do not extend reporting deadlines.
Gravetat |
Definition |
Target Acknowledge |
Target Initial Action |
|---|---|---|---|
Critical |
interrupció total; Compromís de l’administració; Incompliment de dades activa; requereix una contenció immediata. |
< 30 minuts |
< 4 hores |
Alta |
fallada de les funcions bàsiques; Fuga de PII d’un sol usuari. |
< 2 hores |
12 hores |
Mitjana |
Degradació del rendiment; Petit problema de seguretat. |
1 dia laborable |
3 dies laborables |
Baixa |
errors de la interfície d’usuari; Problemes d’escenificació; Errors no de seguretat. |
Best Effort |
Best Effort |
Cicle de vida de resposta a incidents¶
Preparation¶
Ensure regular daily backups of the PostgreSQL database and the data directory using Weblate’s built-in backup with rotation, see Còpia de seguretat i moviment de Weblate.
Assegureu-vos que Weblate utilitzi un servidor intermediari invers configurat correctament (p. ex., NGINX) amb HTTPS (TLS 1.2+).
Activa 2FA per a tots els comptes de nivell d’administrador.
Mantenir actualitzada la instància Weblate i les seves dependències (Python, Django, Celery, base de dades, etc.).
Integrar-se amb sistemes SIEM mitjançant el protocol GELF per a l’auditoria i el reenviament de registres d’aplicacions.
Complete the preparation checklist in Incident reporting and keep private contact and access details current.
Identification¶
Superviseu els registres del sistema i de les aplicacions (
journalctl, registres de servidor intermediari invers, registres d’aplicacions Weblate i d’auditoria).Analitzeu esdeveniments d’inici de sessió, execucions de webhook i errors push/pull.
Configureu les alertes (mitjançant Prometheus, Zabbix o SIEM) per a errors d’inici de sessió múltiples, reinicis inesperats o accions VCS irregulars.
Record awareness times and assess authority and user notifications using Incident reporting, without waiting for a complete investigation.
Assess whether a security incident caused accidental or unlawful destruction, loss, or alteration of personal data, or unauthorized disclosure or access, and follow Personal-data breach notifications. This includes availability or integrity breaches without disclosure, such as accidental deletion or ransomware destruction. Seek privacy advice where needed while continuing investigation and reporting preparation.
Personal-data breach notifications¶
The incident handler determines whether Weblate acts as controller or processor for the affected processing and records the assessment in the private incident note. Under GDPR Article 33:
As controller, notify the competent supervisory authority without undue delay and, where feasible, within 72 hours of becoming aware of the personal-data breach, unless the breach is unlikely to result in a risk to individuals” rights and freedoms. Record the reason for a decision not to notify.
If notification takes longer than 72 hours, include the reasons for the delay. Where information cannot be supplied together, provide it in stages without undue further delay.
As processor, notify the controller without undue delay after becoming aware of a personal-data breach; do not wait for the controller’s 72-hour deadline.
The controller’s supervisory-authority notification must include the following information under Article 33(3):
The nature of the breach, including, where possible, the categories and approximate numbers of affected individuals and personal-data records.
The name and contact details of the person who can provide further information, such as the incident handler or a data protection officer if one is appointed.
The likely consequences of the breach.
Measures taken or proposed to address the breach, including measures to reduce its adverse effects where appropriate.
Identify information that is not yet available and provide it in follow-up notifications without undue further delay. Do not wait for exact counts before notifying the authority.
As controller, separately assess communication to affected individuals under GDPR Article 34. If the breach is likely to create a high risk to their rights and freedoms, inform them without undue delay unless an Article 34(3) exception applies. This applies even without active exploitation or a severe product-security incident. Notification to the supervisory authority does not replace this communication.
Explain the breach in clear language, giving a contact for further information, likely consequences, measures taken or proposed, and actions individuals can take. Record the assessment and any exception relied on: effective protection of the affected data, such as encryption making it unreadable to unauthorized people, or subsequent measures ensuring the high risk is no longer likely. If individual communication would involve disproportionate effort, use public communication or a similar measure that informs individuals equally effectively. See the EDPB data-breach guidance.
Record breach-awareness timestamps, recipients, and deadlines separately from CRA reporting. A CRA submission does not replace a GDPR notification, and the two reporting clocks may start at different times.
Containment¶
Maintain the private incident note from Incident reporting, including timeline updates, reporting deadlines, and submission receipts.
Coordinar la resposta humana a Señal i mantenir l’alerta tècnica als sistemes de monitorització existents.
Per als incidents de categoria 1 o 2, creeu una Hetzner Cloud Snapshot manual abans de prendre mesures perjudicials quan sigui segur fer-ho.
Format del nom:
IRP-[CaseID]-[YYYYMMDD]-Evidence.Aquestes són separades de les còpies de seguretat rotatives estàndard i s’han de conservar per analitzar-les.
Aïlleu l’amfitrió o el servei afectats segons sigui necessari (per exemple, mitjançant regles de tallafoc o aïllament del servei).
Desactiveu les integracions externes (Git/webhooks) si formen part del vector d’atac.
Suspensió immediata dels comptes d’usuari afectats.
Revoqueu o gireu les credencials administratives, API, VCS i webhook afectades segons correspongui.
Preserveu les proves rellevants, inclosos els registres del sistema, els registres de servidor intermediari invers, els registres d’auditoria i d’aplicacions Weblate, l’estat de configuració afectat i la llista de credencials o integracions afectades.
Eradication¶
Elimina qualsevol codi o dades no autoritzats.
Apliqueu les vulnerabilitats conegudes actualitzant Weblate o components del servidor.
Valideu la integritat del binari i del dipòsit mitjançant sumes de control SHA-256 o registres de Git.
Recovery¶
Restaura els serveis o les dades afectats a partir de les darreres còpies de seguretat de Weblate que es coneixen.
Reintroduir els serveis en un enfocament gradual.
Confirmeu que s’ha eliminat la causa principal o que hi ha un control compensador abans de restablir el trànsit normal.
Gireu les credencials afectades i verifiqueu la integritat del sistema, els repositoris i la configuració restaurats.
The handler records the decision to return to normal operations, checking recovery with the backup or another teammate where practical.
Superviseu els registres i el comportament del sistema contínuament durant almenys 72 hores després de la recuperació.
Post-incident review¶
Timeline: Hold a short team review within 5 business days of incident closure.
Elaboreu un calendari complet d’incidències i les accions preses.
Realitzeu l’anàlisi de la causa arrel (RCA) i documenteu-lo en un termini de 10 dies laborables.
Actualitzeu les polítiques de seguretat i la documentació IRP en funció de les conclusions.
Revisar l’efectivitat dels mecanismes de detecció i contenció.
Verifiqueu si l’escalada, les alertes i la comunicació externa van seguir Vulnerabilitat i gestió d’incidències com s’esperava.
Check for outstanding reports, promised updates, and delayed disclosures before closing the incident note.